Waterproof concrete from the ready-mix concrete plant

With Penetron Admix, concrete becomes waterproof as it is mixed. The admixture goes into the mix as a powder, in dissolvable bags or as a liquid, at the plant or on site.

A truck mixer fills an orange concrete skip on the construction site of the buffer tank at HoogTij in Amsterdam, with storage tanks in the background.

At the ready-mix concrete plant, waterproof concrete comes down to two things: the dosage and the order in which everything goes into the drum. Penetron Admix reacts with the moisture in the fresh concrete and with the by-products of cement hydration, and forms crystals in the pores and capillaries. The concrete that leaves the plant therefore already carries its waterproofing within it.

Admix, Admix SB or Admix Liquid

Admix SB is the same powder as Admix, but already weighed out in dissolvable bags. Admix Liquid is the liquid form, for those who work with large volumes.

ProductFormDosage
Penetron AdmixPowder0.8 to 1.0 per cent of the weight of the binders
Penetron Admix SBPowder in dissolvable bags of 3 kgOne bag per cubic metre of concrete, within 1 per cent of the weight of the binders for most mixes
Penetron Admix LiquidLiquid1.0 litre per 100 kg of binders

An example for the powder. For C25/30, the calculator uses a cement content of 320 kg per m³ as standard. At a dosage of 1.0 per cent, 3.2 kg of Admix goes into every cubic metre. On the product page, the calculator works this out for your own mix and volume.

How Admix goes into the mix

The order depends on the installation. The data sheet gives a guideline for each method:

  • Dry mixing in the truck mixer. The powder goes into the drum first. Then 60 to 70 per cent of the mixing water follows with 136 to 227 kg of aggregate, and this is mixed for 2 to 3 minutes. The rest follows according to normal practice.
  • Central mixing. The powder is first mixed with water into a thin slurry, for example 18 kg of powder with 22.7 litres of water, and poured into the drum. When dosing, allow for the water that is already in the drum. After the concrete has been added, everything is mixed for at least 5 minutes.
  • Precast. The powder goes in with the sand and the gravel and is mixed for 2 to 3 minutes. Only then do the cement and water follow.
  • Admix SB. The bag goes straight into the drum, just before the water and the aggregate. In a central mixer, it preferably goes in first, before all other components, and the concrete is then mixed for at least 70 revolutions, about 5 minutes.

Never sprinkle dry powder onto wet concrete: it forms lumps and does not disperse. The concrete mix must be warmer than 4 °C, and you store the powder dry, at 7 °C or higher.

A truck mixer behind a stack of blue buckets of Penetron Admix SB.
Admix SB comes in dissolvable bags of 3 kg, which go straight into the drum.

Checks at the plant and on site

Admix can be included in various mix designs and works together with common admixtures such as superplasticisers and retarders. A trial mix beforehand is recommended.

Admix SB contains a green indicator. The water that rises to the surface during pouring and curing turns green, so the contractor can see that the product is really in the mix. The concrete itself does not change colour. For Admix, there is the Penetron Admix Tracer, a fluorescent tracer with which you can check the dosage and the mixing in the concrete.

The buffer tank at HoogTij in Amsterdam

On the industrial estate HoogTij in Amsterdam, a concrete buffer tank was built for the water recovery and process circuit of a new factory. The structure had two wall zones, 540 m³ of concrete in total: 234 m³ and 306 m³. Penetron Admix SB went in dissolvable bags straight into the concrete mixers at the ready-mix concrete plant. This gave an accurate dosage and kept the handling simple.

Penetron Benelux was present at the first pours, for technical follow-up and to check the workability and the homogeneity of the mix. The result is a waterproof, low-maintenance buffer structure, without additional coatings or membranes.

At the plant or on site

For the sludge bunker of Aquafin in Ghent, AC Materials supplied the concrete. The bunker was built with a slipform and a continuous concrete pour, day and night, and Admix SB went into the mix directly at the ready-mix concrete plant. For the biotanks of Indaver in Antwerp, Penetron Admix went into the concrete mixers on site. Which route suits you depends on the installation and the planning. An adviser from Penetron Benelux will tailor the method to your plant.

Questions

How do I dose Penetron Admix at the plant?

The powder: 0.8 to 1.0 per cent of the weight of the binders. Admix SB: one dissolvable bag of 3 kg per cubic metre. Admix Liquid: 1.0 litre per 100 kg of binders. The calculator on the product page works it out for your mix.

When do I add Admix to the mix?

During mixing, and never dry onto wet concrete. In the truck mixer, the powder goes into the drum first, before the water and the aggregate. In a precast plant, it goes in with the sand and the gravel.

Does Admix work together with other admixtures?

According to the product information it does, with common admixtures such as superplasticisers and retarders. A trial mix beforehand is recommended.

How does the contractor see that Admix is in the concrete?

With Admix SB, the water that rises to the surface during pouring turns green. For Admix, there is the Penetron Admix Tracer, a fluorescent tracer for checking the dosage and the mixing.

Two people in high-visibility vests and helmets in the warehouse with Penetron products

Contact

Discover how Penetron can strengthen your next construction project

Tell us about your project. We will help you choose the right product.

Request technical advice