As part of Go4Zero, Holcim's ambitious climate-neutral transformation project in Obourg, an underground concrete gallery is currently being built. This gallery is part of a larger cement production infrastructure of the future, with a focus on net-zero emissions by 2030, a first in Belgium and Europe.

A collaboration between innovative players

This unique project comes about thanks to a strong collaboration between BESIX, Denys, Holcim and Penetron Benelux. For the waterproofing of the in-situ cast concrete tunnel structure, an integral crystalline system based on Penetron Admix SB was chosen.

The tunnel is partly below the groundwater level, which causes significant water pressure on the concrete structure. The combination of sustainability, complexity and chemical stress requires a high-performance and self-healing system that ensures waterproofing, both during construction and in the future.

Why Penetron Admix SB?

  • Permanent integral waterproofing thanks to crystal formation in capillaries
  • Self-repairing capacity for cracks up to 0.5 mm
  • Resistance to external water pressure and chemical stress
  • No external membranes required: simpler construction, increased safety
  • Perfectly combinable with sustainable types of cement 

On-site application

  • Zone-by-zone execution: floor slab, walls and roof slab are cast in succession per tunnel zone
  • Penetron Admix SB is added at the ready-mix concrete plant
  • Installation of the Penebar SW type A and B in the cold joints

BESIX and Denys were commissioned to build more than 70 structures for the new clinker line, including a silo 60 metres high. On 16 May 2024, Holcim gave the go-ahead for the first phase. The project is expected to capture about 1.1 million tonnes of CO₂ per year. The plan is for that CO₂ to travel via the Fluxys network to the export hub Antwerp@C, where it will be liquefied and shipped to storage under the North Sea.

Solutions applied

  • Penetron Admix SB: crystalline admixture for waterproof concrete structures
  • Penebar SW: swellable strip for watertight construction joints

Progress under way

The first foundation zones and wall sections are currently under construction, with support from our technical team on site. This project underlines how sustainable construction and high-performance concrete chemistry go hand in hand in the transition to climate-neutral infrastructure.

Project location: Holcim site Obourg, Belgium
Partners: BESIX, Denys, Holcim and Penetron Benelux

Three employees in high-visibility vests between the racks of Penetron products

Discuss your project with an adviser

Call, email or use the contact form and get advice on the right product, for new and existing concrete.

Request technical advice