SABESP Taubaté Wastewater Treatment Plant
The SABESP sewerage plant in Taubaté, São Paulo, one of the most industrialised areas in Brazil, treats all wastewater from Taubaté and the neighbouring Tremembé region, with a total population of over 300,000 people. This installation received a design award from the National Water Authority.
SABESP, the largest sanitation company in Latin America, had the existing treatment plant in Taubaté renewed. It lies between São Paulo and Rio de Janeiro, the two most important cities in Brazil, and plays a major role in the recovery of the Paraíba do Sul. That river is an important water source for about 13.5 million people.
Penetron Slurry went on all tanks, together roughly 23,000 m² of concrete. For the construction joints and the formwork tie holes, Penecrete Mortar was added.
Solutions applied
After extensive laboratory tests, the Penetron system was chosen to protect all tanks and to seal the existing shrinkage cracks and other cracks. The effectiveness of Penetron was visible, as almost all leaks and cracks were sealed within 2 weeks.
Discuss your project with an adviser
Call, email or use the contact form and get advice on the right product, for new and existing concrete.