Melrose Minnesota Wastewater Treatment Plant

Referentie, waterzuivering

Melrose Minnesota Wastewater Treatment Plant

LocatieMelrose, United States
ApplicationWaterzuivering
ProductPenetron Admix SB

Located on the banks of the Sauk River and surrounded by the Big and Little Birch Lakes, Lake Sylvia and more lakes beyond, a landscape typical of Minnesota, Melrose is a city of approximately 4,000 people along the I-94 highway corridor in the middle of the state. Founded in the late 19th century, when the railroad boom reached the area, the city today has a vibrant centre, a K-12 public school system (and private schools), a modern hospital and medical centre, and even a historical society.

Inspections showed that the concrete of key parts of the treatment plant in Melrose was severely deteriorated. The plant has been operating since 1963, and approximately 80 per cent of the incoming wastewater comes from homes and three local factories. The $9 million expansion, which includes a new inlet building and new settling tanks, adds 500,000 gallons (approximately 1,900 m³) per day of extra capacity.

The engineers of engineering consultant SEH wanted to protect the new concrete against corrosion, chemical attack and the aggressive wastewater. Ready-mix concrete plant Worms Lumber & Ready Mix added Penetron Admix SB to the mix for the new structures.

Solutions applied

"Penetron Admix SB was chosen over a number of competing additions that were rated as the best product to improve the impermeability of concrete and extend the life of the expanded facility in Melrose," adds Christopher Chen. "The easy dosing with soluble bags and technical support throughout the project also helped influence Penetron's decision."

Two people in high-visibility vests and helmets in the warehouse with Penetron products

Discuss your project with an adviser

Call, email or use the contact form and get advice on the right product, for new and existing concrete.

Request technical advice