The Longtan hydroelectric station was put into operation at the end of 2009 and was then the second largest in China. It generates some 18.7 billion kWh per year. The hydroelectric station is 216.5 metres high and 836 metres long.

The dam is on the Hongshui, a tributary of the Xi, in Tian'e County in the Guangxi region. When it was completed, this gravity dam was the tallest roller-compacted concrete dam in the world.

Construction officially began on 1 July 2001. The filling of the reservoir, which can hold up to 27.27 billion m³ of water, started in 2006.

Penetron Slurry was applied to the entire upper part of the dam structure.

Solutions applied

Penetron was applied to the entire upper dam structure to provide complete waterproofing protection.

Three employees in high-visibility vests between the racks of Penetron products

Discuss your project with an adviser

Call, email or use the contact form and get advice on the right product, for new and existing concrete.

Request technical advice