Wastewater Treatment Plant
The recent completion of a major upgrade to Itatiba's municipal wastewater treatment plant enabled SABESP, Brazil's largest water and waste management company, to meet the latest environmental standards and increase treatment capacity by 500 litres/second.
For the upgrade of the treatment works in Itatiba, 80 km north of São Paulo, SABESP acted as main contractor itself. The plant went into operation in June 2024.
Groundwater presses against the concrete of the tanks from below, while above it the tanks hold wastewater containing chlorides and the chemicals added during treatment. After consultation with Penetron Brazil, SABESP chose the Penetron system. Stemag Engenharia applied Penetron Slurry to the tanks.
Solutions applied
Penetron, a topical crystalline waterproofing material, was applied to the prepared surfaces of the concrete treatment plants to reduce permeability and improve resistance to the aggressive effluent environment. Penebar SW swellable water stop strips were used to seal all construction joints, pipes and mounting holes.
More projects
Also in practice
Discuss your project with an adviser
Call, email or use the contact form and get advice on the right product, for new and existing concrete.