The completed $6.8 million project was built by Gridor Construction, the project's main contractor. During the planning phase, the project engineer at Short Elliott Hendrickson contacted Penetron for a reliable waterproofing solution for the wastewater treatment plant (WWTP)'s new concrete elements. After assessing cost-effectiveness, simplified dosing with pre-measured soluble bags and on-site technical support from Penetron's local representative, Penetron Admix SB was specified for the Madrid project.
The treatment plant in Madrid, a small town in Iowa, dates from the 1960s.
The treated water flows into Murphy Branch Creek, a tributary of the Des Moines River that is used for recreation in the area. Prolonged contact with the discharged water posed a potential health risk, and the upgrade could not wait.
Penetron Admix SB makes the new concrete less permeable and more resistant to chemicals. The works, which included a new activated sludge biological system and new UV disinfection, were completed in December 2020.
Solutions applied
Penetron Admix SB, supplied in pre-measured soluble bags, was added to more than 1,300 cubic yards (1,000 m³) of concrete by Hamilton Ready-Mix, the concrete supplier, and was used for the floors and walls of the water storage structures, the aero-mod treatment tank and the diversion structure.