Gavardo Municipal Wastewater Treatment Plant
The plant, built in a hilly environment, consists of two parallel treatment lines. Both treatment lines include coarse and fine screening processes, lifting pumps, oxidation and denitrification tanks, sedimentation tanks, sludge treatment lines, disinfection and air treatment with biofilters. The plant is built on three levels, with the configuration using gravity to minimise energy consumption during the treatment processes. The final discharge of the treated water takes place in the adjacent Chiese River.
The new treatment plant is located south of the centre of Gavardo, on the Chiese, not far from Lake Garda. It replaces two worn-out installations from the 1970s, which no longer provided sufficient treatment for the region as it has grown. Gavardo and the neighbouring municipalities of Vallio Terme and Villanuova sul Clisi became subject to a European infringement procedure. The new plant must be sufficient until 2045.
Main contractor A2A Ciclo Idrico asked Penetron for advice, because the concrete had to withstand moisture and aggressive effluent for its planned service life. Penetron Italia recommended Penetron Admix for all new tanks and concrete structures.
Solutions applied
Penetron Admix was specified for all concrete structures that are exposed to moisture and the aggressive environment caused by the effluent. As a crystalline addition, Penetron Admix is added during mixing and gives the concrete low permeability, low shrinkage and self-healing properties, providing highly effective protection against the aggressive chemical environment found in sewage treatment plants.
Discuss your project with an adviser
Call, email or use the contact form and get advice on the right product, for new and existing concrete.