Technical advice
Füssen Tunnel

Referentie, tunnels en infrastructuur

Füssen Tunnel

The Füssen Tunnel is 1,284 m long and connects the German city of Füssen in Bavaria with the Austrian city of Pinswang in Tyrol. The tunnel was first completed in 1999.

LocatieFüssen, Germany
ApplicationTunnels en infrastructuur
ProductPenetron Slurry

The tunnel has a single bore with one lane in each direction and runs beneath the Vilser Berg. It takes holiday traffic heading for the Fernpass out of the centre of Füssen. Penetron Slurry was applied to the concrete of the evacuation exits.

During excavation in March 1996, water unexpectedly flowed in, initially at around 400 litres per second. Injections ahead of the tunnel face limited the inflow, so the medicinal Nothburga spring at Bad Faulenbach was kept out of danger. The breakthrough was nevertheless delayed by about nine months.

Solutions applied

Penetron products were used to make the tunnel evacuation exits watertight.

Two advisers discussing a project at a table, with plans and a screen

Discuss your project with an adviser

Call, email or use the contact form and get advice on the right product, for new and existing concrete.

Request technical advice