Referentie, waterzuivering
Concrete bunker Aquafin Ghent, a technical feat in slipform construction
Penetron contributes to durable waterproofing of a 40 metre high sludge bunker
In Ghent, an impressive project was recently completed: the construction of a concrete bunker almost 40 metres high for sludge storage, realised for Aquafin, which develops and manages the water treatment infrastructure in Flanders. The bunker was built entirely using slipform construction with a continuous concrete pour (24/24), a technical tour de force that demanded meticulous preparation and high-performance concrete solutions.
A challenging project in cooperation with strong partners
Led by BESIX, with AC Materials as concrete supplier and BM Engineering as engineering consultant, a concrete mix with exceptional watertightness and durability was chosen, matched to the heavy chemical and physical loads (environmental classes EE3 / XA2 / XF1).
Why Penetron Admix SB?
To protect the concrete against the high hydrostatic pressure and aggressive substances that come with sludge storage up to 20 metres high, Penetron Admix SB was chosen, an integral crystalline waterproofing admixture that was added directly at the ready-mix concrete plant. The benefits:
- Watertight at the crack widths the bunker is designed for, 0.1 to 0.3 mm; the technical data sheet of Penetron Admix SB mentions hairline cracks up to 0.5 mm
- Self-repairing properties for durable protection
- Resistance to chemical attack and hydrostatic pressure
- No need for external membranes or coatings
- Extended service life of the foundation slab and walls (min. 50 years)
Activities carried out
- Integral waterproofing of the foundation slab (approx. 753 m³) and the walls (approx. 2,360 m³)
The FOSTER consortium, made up of BESIX and Indaver, is responsible until 2046 for Aquafin's new sludge processing in the port of Ghent, from design to operation. The installation, on the site of ArcelorMittal Belgium, is due to start up in 2027 and will then process two thirds of Flemish sewage sludge: the sludge of some four million people in Flanders.
Day and night the slipform climbed upwards, until it reached full height after 20 days, without interrupting the pour: the bunker is made in one piece. In the process, 750 tonnes of reinforcing steel were used.
Solutions applied
- Penetron Admix SB: For permanent integral waterproofing of concrete
Sustainable result through cooperation
Thanks to the close cooperation with all partners, a forward-looking solution was delivered, without the need for external membranes or coatings. This project shows how innovative concrete chemistry combined with strong execution leads to sustainable infrastructure.