Technical advice
WestConnex Highway Tunnels

Project, tunnels and infrastructure

WestConnex Highway Tunnels

LocationSydney, Australia
ApplicationTunnels and infrastructure
ProductPenetron Admix

WestConnex is designed to improve connections between Sydney's eastern and western districts, alleviate congestion and connect the city's network of motorways. The $16.8 billion project is the largest road infrastructure project ever undertaken in Australia. This phase of the highway network expansion includes 33 km (21 miles) of mostly underground highway.

The M4-M5 Link consists of two 7.5 km tunnels, each with four lanes. They connect the new M4 with the M5 and route traffic around Sydney's central business district. The tunnels opened in January 2023, after the M4 East in July 2019 and the M8 a year later.

Penetron Admix was specified for the concrete mix of the M4-M5 Link thanks to Penetron's results in tunnels elsewhere in the world, says Steve Hodkinson, general manager of Penetron Australia.

Solutions applied

During the planning phase of the WestConnex tunnels, the project engineers needed an optimal concrete admixture that would guarantee impermeable and durable concrete tunnel walls for the most recent phase of construction. Penetron Australia provided test results showing how concrete treated with Penetron Admix provided improved corrosion resistance and significantly improved the durability of the concrete, even under the high hydrostatic conditions of the underground tunnels of the WestConnex motorway network.

Two people in high-visibility vests and helmets in the warehouse with Penetron products

Contact

Discover how Penetron can strengthen your next construction project

Tell us about your project. We will help you choose the right product.

Request technical advice