Due to the expected increase in public transport for the 2016 Summer Olympics in Rio de Janeiro, the city has made major investments in infrastructure. Investments in the construction of the metro are the most significant, and new lines are appearing, such as Line 4. This line will connect Barra da Tijuca (west) to Ipanema (south zone) and carry more than 300,000 people per day. Line 4 is 16 km long and includes 6 new stations.

The works on Line 4 were carried out by the Rio Barra consortium. The line was inaugurated on 30 July 2016, just before the Olympic Games, but during the Games it could only be used by people with a ticket or by members of the Olympic family. It was not until 17 September that it opened to everyone.

In the stations with a floor slab under water pressure, Penetron Admix went into the concrete to guard against the water from the sandy soil. One of those stations is Antero de Quental in Leblon, built under the square of the same name.

Solutions applied

The biggest challenge of this metro line extension was that the line runs through sandy soil with a large presence of water. This was mainly a problem at the stations that were built with a sheet pile wall and a pressurised slab. At the stations that used slabs, such as Nossa Senhora da Paz, Antero de Quental, Jardim de Alah and Jardim Oceânico, Penetron Admix and Penebar SW-55 were essential to achieve superior protection and watertightness performance.

Two advisers discussing a project at a table, with plans and a screen

Discuss your project with an adviser

Call, email or use the contact form and get advice on the right product, for new and existing concrete.

Request technical advice